FABER Awards 2026: Hospitality Edition Celebrating the Spaces That Welcome Us

Hospitality is one of the most powerful expressions of the built environment. Beyond providing accommodation or dining, hospitality spaces shape first impressions, create lasting memories and reflect the identity, culture and aspirations of the places they inhabit. Across Albania, a new generation of hotels, boutique stays, resorts, restaurants, cafés, wineries, and hospitality destinations is redefining the relationship between architecture, landscape, design and tourism. These projects not only respond to the growing demands of the hospitality sector but also contribute to the transformation of cities, coastal areas and rural communities through thoughtful design and innovative spatial experiences.

The Hospitality Edition of FABER Awards 2026 celebrates the hospitality projects that are shaping this transformation. The initiative invites the public to discover, explore and vote for the projects they believe best represent excellence in hospitality architecture and design. Rather than focusing solely on aesthetics, the awards encourage reflection on how hospitality spaces engage with their surroundings, respect local identity, enrich the visitor experience and contribute to the quality of the built environment.

The projects receiving the highest number of public votes will be announced during FABER 2026, continuing the Forum’s mission to promote dialogue, innovation and public engagement in architecture, urbanism and the built environment.

Green Coast Hotel – MGallery Collection

Architect/design team
Belgian concept-design studio not publicly named; interiors by Jonida Buda
Location
Palasë, Himarë
Status and year
Completed and operational, 2025
Context
A 131-room hotel using stone, natural materials and coastal colours to connect the building with the landscape.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Meliá Durrës Albania

Architect/design team
Álvaro Sans / ASAH; interiors by Room 1804 and ASAH
Location
Gjiri i Lalëzit, Durrës County
Status and year
Completed, 2023
Context
Large beachfront resort organised around pools, gardens and Mediterranean-inspired interiors.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Kep Merli Resort

Architect/design team
Boiken Developments; Marine Villas by Enea Kondakci and Agim; landscape by Skopos Design
Location
Kep Merli, Ksamil, Sarandë Municipality
Status and year
Operational and developed in phases, c.2019–present
Context
Low-density resort and residential destination distributed across a wooded peninsula near Butrint.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Maritim Hotel Plaza / TID Tower

Architect/design team
51N4E + Atelier 4
Location
Tirana
Status and year
Completed, 2016
Context
A mixed-use tower integrating the protected Kapllan Pasha Tomb into its public ground-level composition.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Hilton Garden Inn Tirana

Architect/design team
Atelier 4; lead-project involvement by Flogert Lila
Location
Tirana
Status and year
Completed and operational, 2018
Context
Albania’s first Hilton-branded hotel, combining business hospitality with conference facilities.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Rogner Hotel Tirana

Architect/design team
Original design team to verify; 2015 reconstruction by Plan Werk Süd + Sfera Studio
Location
Dëshmorët e Kombit Boulevard, Tirana
Status and year
Opened 1995; renovated 2015
Context
A low-rise crescent-shaped hotel organised around one of central Tirana’s largest private gardens.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Adriatik Hotel

Architect/design team
Gani Strazimiri
Location
Durrës Beach
Status and year
Completed 1957; major renovation 2003
Context
One of Albania’s most important early post-war coastal hotels and a reference in the history of state tourism.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Maritim Resort Marina Bay

Architect/design team
Antonio Chilorico; fit-out and furnishing by Able
Location
Uji i Ftohtë, Vlorë
Status and year
Operational since 2019
Context
A large waterfront hotel, spa and casino complex positioned in a secluded bay south of Vlorë.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Bougainville Bay Resort & Spa

Architect/design team
Design and development by AGIKONS; individual architect not publicly credited
Location
Sarandë
Status and year
Completed and operational, c.2016–2017
Context
A dense, terraced resort characterised by mosaics, ceramic artwork, planted passages and interconnected public spaces.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Hotel Saranda Butrinti

Architect/design team
Original design by Anton Lufi and A. Shani
Location
Sarandë
Status and year
Original building 1968; subsequently renovated
Context
A significant example of Albania’s socialist-period coastal hospitality architecture, now operated in affiliation with Meliá.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
La Brisa Boutique Hotel

Architect/design team
Focus Architecture: Enkelejd Karanxha, Gentian Parruca, Florida Hoxha and Redon Iljasllari; later furnishing by Able
Location
Dhërmi, Himarë
Status and year
Realised 2021–2023; additional fit-out 2024
Context
A contemporary beachfront hotel distinguished by layered planes, generous terraces and rooftop water elements.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Drymades Inn Resort

Architect/design team
Tombazis & Associates Architects
Location
Drymades, Dhërmi
Status and year
Operational; extension designed and constructed from 2018 onward
Context
An extension of an established coastal resort, combining hotel accommodation with landscaped outdoor spaces.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
San Nicolas Resort & Residences

Architect/design team
Architect not yet publicly confirmed; developer Concord Investment
Location
Palasë–Drymades coast, Himarë
Status and year
Phased development; soft opening 2026
Context
A 150,000 m² resort comprising villas, apartments, hospitality facilities and extensive planted areas.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Tirana Marriott Hotel

Architect/design team
Archea Associati + Atelier 4within the National Arena complex
Location
Tirana
Status and year
Completed and opened, 2023
Context
A 155-room hotel integrated into the National Arena tower, overlooking the stadium and central Tirana.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Zoe Hora

Architect/design team
Mosko Atelier, with a wider multidisciplinary team
Location
Historic village of Dhërmi
Status and year
Completed and operational, c.2023
Context
An adaptive-reuse project transforming historic stone houses into a 37-room hospitality destination while retaining the village fabric.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Miamar Hotel

Architect/design team
Andaras Studio Architecture & Design
Location
Livadhi Beach, Himarë
Status and year
Designed and constructed 2017–2020
Context
A 4,500 m² beachfront hotel combining modern interiors, wellness facilities and uninterrupted Ionian views.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Yacht Hotel

Architect/design team
Andaras Studio
Location
Lungomare, Vlorë
Status and year
Completed, 2022
Context
A compact hotel conceived with the visual language of a vessel, using curved white balconies against a darker glazed façade.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Tirana International Hotel

Architect/design team
Valentina Pistoli and design team
Location
Skanderbeg Square, Tirana
Status and year
Completed 1979; major renovation 2001
Context
A landmark of Albanian socialist modernism and, for many years, the tallest building in the country.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Mrizi i Zanave Agroturizëm

Architect/design team
Plis Atelier
Location
Fishtë, Lezhë Municipality
Status and year
Completed, c.2018–2019
Context
Adaptive reuse of a rural stone structure through a contemporary glass volume, supporting local food production and agrotourism.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Melesin Distillery

Architect/design team
Architect not publicly credited
Location
Leskovik, Kolonjë Municipality
Status and year
Opened, 2023
Context
Adaptive reuse of an industrial building as a distillery, restaurant and nine-room boutique hotel, linked to the agricultural identity of Leskovik.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Valbor Hotel

Architect/design team
Studio B&L; lead architect Ermal Bleta
Location
Valbona Valley, Tropojë
Status and year
Completed, 2023
Context
A contemporary interpretation of Alpine architecture using steep roofs, dark cladding and framed mountain views.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Hotel Thethi

Architect/design team
2Sh Studio Arkitekture
Location
Theth, Shkodër Municipality
Status and year
Completed and operational, c.2024–2025
Context
A mountain hotel combining contemporary hospitality spaces with forms and materials associated with the architecture of Theth.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Durrës Yachts & Marina

Architect/design team
Masterplan credit currently given to Archea Associati, but a direct architectural source should be requested from the developer
Location
Former Port of Durrës
Status and year
Under construction, 2023–ongoing
Context
A long-term waterfront transformation including a marina, hotels, approximately 13,000 residences, retail and public promenades.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Vlora Marina

Architect/design team
XDGA – Xaveer De Geyter Architects
Location
Former port area, Vlorë
Status and year
Under construction, c.2022–ongoing
Context
A marina-led urban development combining public waterfront spaces, residential buildings, hospitality and commercial uses.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Vlora Landmark Resort – Meliá Collection

Architect/design team
Oppenheim Architecture
Location
Lungomare, Vlorë
Status and year
Under development/construction, 2025–ongoing
Context
An integrated resort and branded-residence destination connecting the waterfront with landscaped hillside buildings.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
InterContinental Tirana

Architect/design team
BOLLES+WILSON / Peter Wilson + Atelier 4
Location
Skanderbeg Square, Tirana
Status and year
Under construction since 2021; opening date to reconfirm
Context
A 33-storey, approximately 300-room hotel tower conceived as an extension of the Tirana International complex.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
The Veil

Architect/design team
Bofill Taller de Arquitectura
Location
Forested coastline around Dhërmi
Status and year
Designed 2024; under construction in 2026
Context
A landscape-led resort of 366 apartments and 77 villas positioned along existing contours to limit excavation and preserve mature trees.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Red Sol Resort

Architect/design team
Bofill Taller de Arquitectura
Location
Dhërmi, Himarë
Status and year
Designed/developed c.2024–2026; final construction status to confirm
Context
A terraced red resort inspired by Mediterranean kasbahs and Ricardo Bofill’s earlier housing experiments, including La Muralla Roja.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Rezi Dream Hotel

Architect/design team
Davide Macullo Architects
Location
Vlorë County
Status and year
Designed 2024; proposed/under development
Context
A brick-clad hotel embedded into the terrain, drawing conceptual references from Albanian citadels and coastal topography.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Folie Village / Folie Marine Extension

Architect/design team
Oppenheim Architecture
Location
Jalë, Himarë Municipality
Status and year
Under development, c.2021–ongoing
Context
An extension of the existing Folie destination through interconnected clusters of villas and apartments inspired by coastal village morphology.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Zig-Zag Resort

Architect/design team
JA Joubert Architecture + UNS Architects
Location
Himarë coastline
Status and year
Proposed/design published, 2025
Context
A five-star resort whose linear zig-zag structure follows the rocky terrain while providing each level with sea views and terraces.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani
Dukagjini Resort

Architect/design team
Studio Precht + W10 Architects
Location
Ranë e Hedhun, Shëngjin, Lezhë Municipality
Status and year
Construction began 2025; under construction
Context
A 110,000 m² coastal development comprising residences, a holiday village, hotel, spa, casino and pier, arranged as cascading village-like clusters.

This poll is no longer accepting votes. It closed on October 31, 2026 5:00 pm.
Voto tani